Project Heart
CZ EN

← Back to the roadmap

Water and first facilities F2

Done spring and summer 2026 · 4/4 tasks

Our own water from a well and a place for tools. The basic facilities without which no work on the land is possible.

To work on the land and host events we need water and a place for tools. We arranged a well, chose its location and had the water analysed. A used shipping container serves as a shed.

Photos from this phase
Log entries
  1. Well water analysis

    We have the results of the well water analysis.

    5 July 2026
  2. A shipping container for tools

    We ordered a used 20-foot shipping container to serve as a shed.

    30 June 2026
  3. A spot for the well and shed

    We chose where the well and the tool shed will be.

    25 April 2026
    Photos
  4. Arranging the well

    We signed the power of attorney and the well paperwork got going.

    27 March 2026